Alpha Logistics Services(EPZ) Limited

  • HOME
  • ABOUT
  • SERVICES
    • ALPHA LOGISTICS SERVICES (EPZ) LIMITED
      • MARINE CONTRACTOR
      • CHARTERING OF MARINE EQUIPMENT
      • TOWING & SALVAGE
      • OFFSHORE ENGINEERING
      • PROJECT SUPPORT & LOGISTICS
      • SHIP AGENCY
      • MULTI-MODAL TRANSPORT
    • ALPHA LOGISTICS SERVICES (EPZ) LIMITED
      • PROVISION OF SPECIALIZED MANPOWER
      • PERSONNEL MOVEMENT
      • RIG MOVE OPERATIONS (OFFSHORE & ONSHORE)
      • UNDERWATER WORKS & COMMERCIAL DIVING
      • SUPPLY BASE SERVICES
      • CIVIL ENGINEERING WORKS
      • HOTEL AND ACCOMODATION
  • FLEET
  • PROJECTS
  • CAREERS
  • MEDIA
  • CONTACT
An Alpha Group
Company

Alpha Transporter loaded with Oil Field Equipment

  • 0
admin
Thursday, 04 November 2021 / Published in Engineering, Logistics, Rig move

Alpha Transporter loaded with Oil Field Equipment to be delivered from Mombasa to Songo Songo Island.

The cargo was loaded in Mombasa on our private jetty.
For any inquiry: [email protected]

#ALSL #marinecontractor  #PrivateJetty #VesselCharter #Alphagroup #marine

 

ALPHA GROUPmarinecontractorMombasaPrivateJettyVesselCharter

Mombasa Port Area Road Development Project (Package 2).

  • 0
admin
Friday, 07 May 2021 / Published in Engineering, Logistics

Busy week for Alphahek, our joint venture with Vanthek International, offloading 50 meters long steel tubular piles with diameters of 1500 mm as well as Load test reaction piling works at the Tsunza viaduct for the Mombasa Port Area Road Development Project (Package 2).

As part of the greater Dongo Kundu Special Economic Zone (SEZ) initiative by the Government of Kenya, the Mombasa Port Area Road Development Project (Package 2) involves the construction of the Mwache Junction – Tsunza – Mteza section that consists of the 660 meters Mwache Bridge that will land on the Tsunza peninsula in Kwale County, where it will link up with the Mteza Bridge to complete the South Coast mainland connection.

The Mteza Bridge will be the longest in Kenya at 1,440 meters. The total road length between Mwache junction and Mteza is 8.9 km.

The Dongo Kundu by-pass will connect the Mombasa West mainland to South Coast and is expected to ease movement to and from the southern part of the coastal region.

Alphahek is honored to be playing a pivotal role in making this a reality.

ALPHA GROUPALPHAHEKBRIDGE CONSTRUCTIONKENYA PORTS AUTHORITYLOAD TEST REACTIONMWACHE BRIDGE MOMBASAPILING WORKSROAD CONSTRUCTIONTUBULAR PILESVANTHEK INTERNATIONAL

  

 Privacy Policy

Cookie Policy

Terms and Conditions

Purchase of goods and services

Email Disclaimer

© 2023 All Rights Reserved. Alpha Logistics Services (EPZ) Limited (ALSL)

TOP